1 - Design of the Geo-Traceability Integrated System 1 - Management of Workpackage 1            
1.1 - - Organization of the database            
1.2 - Collecting and organizing exogenous data            
1.3 - Relevant Variables for vineyard terrain            
1.4 - Relevant Variables for the Year            
1.5 - Traceability and Oenology            
2 - Development of an authentication system 2.1 - Management of Workpackage 2            
2.2 - Definition of the concept of integration for the bottle            
2.3 - Definition of the integration process of Bubble Tags            
2.4 - Definition of the production process of Bubble Tags            
2.5 - Definition of authentication software solution in relation to geographic identifiers            
2.6 - Searching for a algorithm of the invariable signature for the Bubble Tags M1 Mx            
3.1 - Development of the Geo-Traceability Integrated System 3.1.1 - Management of the Workpackage 3.1            
3.1.2 - Requirements Analysis            
3.1.3 - Definition of integration process            
3.1.4 - Specifications            
3.1.5 - Implementation            
3.2 - Securing Information 3.2.1 - Management Workpackage 3.2            
3.2.2 - Definition and Research of critical data throughout the chain M1 M8            
3.2.3 - Setting up functional services for processing the information in the chain of trust M9-15            
3.2.4 - Setting up the chain of trust M16-22            
4 - Proof of concept 4.1 - Management of Workpackage 4            
4.2 - - Study of the impact on key actors in the wine industry            
4.3 - Study of the consumer’s acceptability            
4.4 - Summary and generalization of the method Geowine            
5 - Pre industrialization 5.1 - Management of Workpackage 5            
5.2 - Industrializing Bubble Tags low-cost            
5.3 - Industrializing the integration of the Bubble Tags on capsules            
5.4 - Implementing online labelling            
5.5 - Protecting Industrial Property of the GEOWINE system            
5.6 - Implementing the algorithm in the reading system of Bubbles Tags M19 M29            
6 - Validation and Dissemination 6.1 - Management of Workpackage 6            
6.2 - Seminars in clusters            
6.3 - Demonstration in expos, fairs or trade shows            
6.4 - - Designing of the communication toolkit            
6.5 - Communication on European conferences            
6.6 - Meetings with the European Commission            
6.7 - Design and animation of the project website            
7 - Management and Project coordination 7.1 - Daily Management            
7.2 -Intranet for the consortium            
7.3 - Consortium Meeting every three months            
7.4 - Reporting every six months, annual and final            
7.5 - Animation of consortium meetings